High-level review of the country to identify potential areas suitable for wind energy assessment |
A Project Study Area was identified |
Environmental & other constraints were identified |
Site specific surveys are carried out on a preliminary layout to ground truth the information available |
Site-specific surveys and studies were undertaken |
A design layout emerged of this project |
The initial design layout of this project consisted of 8 Turbines |
Consultation commenced with the public, local authorities and interested parties based on the design layout |
The design layout was presented to the public, local authorities and other interested parties and feedback was received on various aspects of the project |
Surveys & Design |
Feedback from meetings with the public and other interested parties informed the design team and influenced the path of the project |
Detailed site specific studies and surveys were carried out including ground investigations, ecology, noise, hydrology, human environment, archaeology, landscape etc. These surveys will continue throughout the design process |
A Technical appraisal was carried out |
Discussions with the local community continued throughout the design process |
Design Review – Interpretation and incorporation of information gathered & Ongoing Consultation |
Information from the detailed site specific surveys, technical appraisals and all feedback from consultation with the public, local authorities and interested parties was taken into consideration |